The old places, where we didnt run the dozer are mint. The new sections are soft and squishy. I have been down there since 5am. Getting ready to fuel up the dozer, and work on the new stuff. We got a pretty good soaker, but the pits are dry, the sidewalk is dry, which are usually good indicators of whether we can go for it or not. I will have the big track ready first, If you plan to ride the C track, you had better hold off till noon. Its gonna take time, but I think I can get it in good shape.
Open at 11:00.
Fyi Driveway is soft because we just dozed it and laid down gravel. Imagine that, everytime i touch the driveway it rains an 1' or more. Its not bad, just dont freak out.